Become a Patron to see this content
This content is available exclusively to members of Justin's Patreon at $1 or higher tier, or having at least $1 pledged in total.
Already a qualifying Patreon member? Refresh to access this content.
Just a quick diagram on how to separate Management traffic on an ePMP network. The aps and CPE are in bridge mode in this setup. The Cambium CPE are in bridge mode with CNPilot routers doing PPPoE, which the ISP has control over as a managed router.
Our netonix has a tagged vlan for the management interface and an untagged vlan for the customer (PPPoE traffic).
The mikrotik router is trunked to the netonix on port 12 to complete this setup.
Below, We have some visio diagrams we have done for customers.
This first design is a customer mesh into a couple of different data centers. We are referring to this as a switch-centric design. This has been talked about in the forums and switch-centric seems like as good as any.
This next design is a netonix switch and a Baicells deployment.
You must be logged in to post a comment.